-
EPM 15047, Ruddygore Project, Partial Relinquishment for period ending 10/12/2020
Partial relinquishment for 3 sub-blocks relinquished on 10/02/2020. Geophysical Review, geophysical interpretation, stream sediment sampling, reconnaissance mapping, rock chip...Data TypeReportCreated08 Mar 2021Data FormatPDF, XLSXNEQ Deposit Atlas - Wolfram Camp Tungsten Deposit
Chapter 1 of the North East Queensland Mineral Deposit Atlas - Wolfram Camp. Dataset package includes the pdf chapter from the Deposit Atlas and a 3D Atlas compiled in in...Data TypeDatasetCreated31 Jan 2021Data FormatPDF, ZIPNorth East Queensland Mineral Deposit Atlas
As part of the New Economy Minerals Initiative , the W.H. Bryan Mining & Geology Research Centre (BRC) compiled an atlas of the major deposits in the Northeast Queensland....Data TypeDatasetCreated31 Jan 2021GSQ Technical Notes - TN2021/01, Depth to Thomson Orogen Surface
The Thomson Orogen is an extensive tectonic element that occupies large portions of central and southern Queensland (see Purdy et al., 2013 for review). Outcrop is restricted to...Data TypeReportCreated04 Feb 2021Data FormatPDF, ZIPNEQ Deposit Atlas - SCONI Ni-Co-Sc Deposits
Chapter 5 of the North East Queensland Mineral Deposit Atlas - SCONI. Dataset package includes the pdf chapter from the Deposit Atlas and a 3D Atlas compiled in in Geoscience...Data TypeDatasetCreated01 Feb 2021Data FormatPDF, ZIPFinal report for EPM 25993 Gipsy Project for the period 8th January 2016 to 7th January 2021
This Final report documents exploration work conducted by Newmont Exploration Pty Ltd (Newmont) on Exploration Permit for Minerals (EPM) 25993 during the reporting period 8th...Data TypeReportCreated07 Mar 2021Data FormatPDF, TXT, ZIP...ATP 768 End of Tenure Report for period ending 2 July 2020
The report describes the broad activities that occurred since the grant of ATP 768 from 1 October 2004 to the relinquishment on 2 July 2020. Exploration and appraisal for coal...Data TypeReportCreated16 Sep 2020Data FormatPDFExploration Permit for Minerals No 16786 Kamileroi 2, Queensland, Final Report
Work completed since grant of EPM 16786 Kamileroi 2 has included MMI soil geochemistry surveys (707 samples) and portions of 3 MT (magneto-telluric) geophysics survey lines.Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPExploration Permit for Minerals No 18757 Coolullah, Queensland, Final Report
Work completed since grant of EPM 18757 Coollullah has included MMI soil geochemistry surveys (628 samples), 7 MT (magneto-telluric) geophysics survey lines and a 430 station...Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPEPM16243 Partial relinquishment report period ending 22/04/2020
Exploration Permit for Minerals EPM16243 (Lady Maggie), was acquired to undertake exploration for copper mineralization in close proximity to the existing facilities at Lady...Data TypeReportCreated29 Sep 2020Data FormatPDF, TXTPL 209 WOLEEBEE EAST 2 WELL ABANDONMENT REPORT
WOLEEBEE EAST 2 in ATP 692 was drilled from 21/10/2008 to 2/11/2008. A Plug and Abandonment was conducted on 27/03/2018. For P&A details, refer to (Daily Compleon &...Data TypeReportCreated28 Sep 2020Data FormatPDFFINAL REPORT EPM 18124, TURPENTINE SOUTH
ANNUAL/FINAL REPORT EPM 18124, TURPENTINE SOUTH FROM 9 JANUARY 2016 TO 8 JANUARY 2021Data TypeReportCreated14 Oct 2020Data FormatPDFPL 216 DALWOGAN 3 WELL ABANDONMENT REPORT
DALWOGAN 3 in ATP 692 was drilled from 8/07/2008 to 16/07/2008. A Plug and Abandonment was conducted on 12/04/2018. For P&A details, refer to (Daily Compleon & Workover...Data TypeReportCreated13 Oct 2020Data FormatPDFATP 667 PENNYCOED CREEK 1 WELL ABANDONMENT REPORT
PENNYCOED CREEK 1 in was drilled from 13/07/2009 to 30/07/2009. A Plug and Abandonment was conducted on 12/12/2017. For P&A details, refer to (Daily Completion &...Data TypeReportCreated20 Aug 2020Data FormatPDFATP 667 YAHOO 1 WELL ABANDONMENT REPORT
YAHOO 1 in was drilled from 04/08/2013 to 19/08/2013. A Plug and Abandonment was conducted on 16/12/2017. For P&A details, refer to (Daily Completion & Workover...Data TypeReportCreated20 Aug 2020Data FormatPDFEPM25969
This report describes all mineral exploration work carried out by South32 on EPM 25969 “Sandila Bore” (the EPM) during the tenement reporting period from grant on 8th January...Data TypeReportCreated04 Sep 2020Data FormatPDF, ZIPNWMP DATA - DRIVEN MINERAL EXPLORATION AND GEOLOGICAL MAPPING - CSIRO MINERAL RESOURCES AND DATA61
NWMP DATA - DRIVEN MINERAL EXPLORATION AND GEOLOGICAL MAPPING - CSIRO MINERAL RESOURCES AND DATA61Data TypeReportCreated07 Aug 2020Data FormatPDF, ZIPEPM 16737, WEE MCGREGOR EAST, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 23/12/2018
EPM 16737 comprising seven sub blocks and was granted on 30 November 2015 for a period of five years. During 2019 2 sub blocks were relinquished from this holding. This report...Data TypeReportCreated28 Aug 2020Data FormatPDFEPM 25467 "Birthday Hills", partial relinquishment report for the period ending 19/03/2020
ActivEX Limited and Ballymore Resources Pty Ltd completed the partial relinquishment of 5 sub-blocks from EPM 25467 in March 2020. No work has been carried out within the...Data TypeReportCreated02 Sep 2020Data FormatPDFEPM17899 Final Technical Report
EPM 17899, referred to as the Hedley project area, forms part of the greater Lawn Hill Project, managed 100% by Teck Australia Pty Ltd (Teck). The project is focused on...Data TypeReportCreated01 Sep 2020Data FormatPDFDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.
Don’t want to wait? Request for a download link to be sent to you
Download started...Your download will start automatically in a few seconds.