EPM26149 SILKYTOP FINAL REPORT FOR PERIOD ENDING 03 JULY 2021

This final report outlines all the work completed by Mount Isa Mines over EPM 26149 Silkytop from the date of grant on 4 July 2016 to the end of the tenure on 3 July 2021. EPM 26149 Silkytop was specifically applied for to test the strongly magnetic feature in sub-block 246-H, but was subsequently noted that this target had been previously tested. Hence, the planned MIM work programme was adjusted, and a desktop review in Year 2 identified a number of other targets. These features of interest were visited in Year 3, and a ground-based MLEM survey was conducted in Year 5 over one of them. The survey produced quality results with high confidence, however effectively sterilised the area for a target.

Files
Sort resources by:

Details

Report persistent identifier CR125769
Report type Coal or Mineral Permit Report - Final (End of Tenure)
Permit number EPM 26149
Report owner MOUNT ISA MINES LIMITED
Report was generated by
Dataset contains these earth science data categories Geophysics
Targeted or actual commodity
  • Copper (Cu)
  • Gold (Au)
Report is of geological features
Report period start date 2016-07-04
Report end date 2021-07-03
Report extents in GeoJSON
Map tiles by MapBox, under CC BY 3.0. Data by OpenStreetMap, under CC BY SA.
Creator Geological Survey of Queensland
Maintainer email GSQOpenData@dnrme.qld.gov.au