This final report outlines all the work completed by Mount Isa Mines over EPM 26149 Silkytop from the date of grant on 4 July 2016 to the end of the tenure on 3 July 2021. EPM 26149 Silkytop was specifically applied for to test the strongly magnetic feature in sub-block 246-H, but was subsequently noted that this target had been previously tested. Hence, the planned MIM work programme was adjusted, and a desktop review in Year 2 identified a number of other targets. These features of interest were visited in Year 3, and a ground-based MLEM survey was conducted in Year 5 over one of them. The survey produced quality results with high confidence, however effectively sterilised the area for a target.