EPM 26775, Pilgrim North Project, partial relinquishment report for the period ending 25/08/2020
This report details the work conducted on relinquished sub blocks within EPM 26775 between the 16th November 2018 and 25th August 2020. 7 sub-blocks have been relinquished.Data TypeReportCreated17 Feb 2021Data FormatPDF, XLSXEPM25779 WARRIOR FINAL REPORT FOR PERIOD ENDING 04 NOVEMBER 2021
EPM 25779 Final report for the period ending 4/11/21. The company has however undertaken a rationalisation of its tenements and has decided to surrender this tenement in order...Data TypeReportCreated10 Nov 2021Data FormatPDF, XLSXEXPLORATION PERMIT FOR MINERALS 25192 NORTH CAMEL DAM RELINQUISHMENT REPORT 2020
No work has been carried out within the relinquished sub-blocks. Compiled open source data supplied by the Geological Survey of Queensland, was used to assess the areas. The...Data TypeReportCreated12 Mar 2021Data FormatPDF, XLSXEPM 17832, Ravenswood Project, final report for the period ending 17/06/2021
This report details work conducted over EPM 17832, "Ravenswood Project," over the life of the tenure, 31 May 2011 to 17 June 2021.Data TypeReportCreated08 Jul 2021Data FormatPDF, XLSXEPM 14038, Robey Range Project, final report for the period ending 17/06/2021
This report details work conducted over EPM 14038, "Robey Range Project," over the life of the tenure, 10 June 2004 to 17 June 2021.Data TypeReportCreated08 Jul 2021Data FormatPDF, XLSXEPM 25467 "Birthday Hills", partial relinquishment report for the period ending 19/03/2020
ActivEX Limited and Ballymore Resources Pty Ltd completed the partial relinquishment of 5 sub-blocks from EPM 25467 in March 2020. No work has been carried out within the...Data TypeReportCreated02 Sep 2020Data FormatPDFEPM19355
1 INTRODUCTION. This annual report presents the results of exploration carried out by Ausdev Land Pty Ltd within E.P.M. 19355 during the period 29 May 2017 to 28 May 2018.Data TypeReportCreated11 Nov 2020Data FormatPDF, XLSXEPM 26286, Eureka #2, final relinquishment report for the period ending 18/12/2020
Final relinquishment report for EPM 26286, Eureka #2.Data TypeReportCreated16 Apr 2021Data FormatPDF, XLSXCentral Eastern Fold Belt, North West Queensland Solid Geology Interpretation and Insights from Crustal Architecture
An updated solid geology interpretation has been produced for a >7100 square kilometre area covering the central part of the Eastern Fold Belt (EFB) southeast of Cloncurry,...Data TypeReportCreated06 May 2021Data FormatPDF, ZIPEPM 27390, Kildare Project, final report for the period ending 10.05.2021
This report details work conducted over EPM 27390, "Kildare Project," over the life of the tenure, 8 June 2020 to 10 May 2021.Data TypeReportCreated14 Jul 2021Data FormatPDF, XLSXExploration Permit for Minerals (EPM) 17466, Victor Creek, Partial Relinquishment report for the period ending 3 August 2020
The tenement is considered prospective for Century and/or Mount Isa style sediment-hosted lead-zinc-silver mineralisation, and sediment-hosted and structurally controlled copper...Data TypeReportCreated27 Aug 2020Data FormatPDFEPM 26628, Argylla Project, partial relinquishment report for the period ending 25/08/2020
This report details the work conducted on relinquished sub blocks within EPM 26628 between the 3rd May 2018 and 25th August 2020. 4 sub-blocks have been relinquished.Data TypeReportCreated17 Feb 2021Data FormatPDF, XLSXEPM27113 MINGERA FINAL REPORT FOR PERIOD ENDING 22 NOVEMBER 2021
This report details work conducted over EPM 27113, Mingera Project, over the life of the tenure, 21 May 2019 to 22 November 2021.Data TypeReportCreated19 Jan 2022Data FormatPDF, XLSXEPM26003 CONNORS ARC PROJECT FINAL REPORT FOR PERIOD ENDING 29 AUGUST 2021
This report details work conducted over EPM 26003, Connors Arc Project, over the life of the tenure, 30 August 2016 to 29 August 2021.Data TypeReportCreated17 Jan 2022Data FormatPDF, ZIP, CSVEPM15858 SUNNY MOUNT PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 22 OCTOBER 2021
This report details work conducted over the four sub-blocks of EPM 15858, Sunny Mount Project, which were relinquished in 2021.Data TypeReportCreated22 Dec 2021Data FormatPDF, CSVEXPLORATION PERMIT FOR MINERALS (EPM) 17466, VICTOR CREEK, FINAL REPORT FOR THE PERIOD 4 AUGUST 2010 TO 3RD AUGUST 2021
EPM17466 is considered prospective for Century and/or Mount Isa style sediment-hosted lead-zinc-silver mineralisation, and sediment-hosted and structurally controlled copper...Data TypeReportCreated27 Jul 2021Data FormatPDF, XLSXANNUAL AND FINAL REPORT EXPLORATION PERMIT NUMBER: 26774 ‘APOPHIS’ THREE RIVERS PROSPECTING PTY LTD REPORTING PERIOD: 23/10/2019 TO 22/10/2020
Exploration Permit Minerals (EPM) 26774 was granted to Three Rivers Prospecting Pty Ltd (Three Rivers) on 23 October 2018 for a period of three (3) years. The tenement comprises...Data TypeReportCreated25 Mar 2021Data FormatZIP, PDFEPM 15047, Ruddygore Project, Partial Relinquishment for period ending 10/12/2020
Partial relinquishment for 3 sub-blocks relinquished on 10/02/2020. Geophysical Review, geophysical interpretation, stream sediment sampling, reconnaissance mapping, rock chip...Data TypeReportCreated08 Mar 2021Data FormatPDF, XLSXEXPLORATION PERMIT FOR MINERALS (EPM), WANGUNDA, PARTIAL RELINQUISHMENT REPORT FOR THE PERIOD ENDING 16 MAY 2020
EXPLORATION PERMIT FOR MINERALS (EPM), WANGUNDA, PARTIAL RELINQUISHMENT REPORT FOR THE PERIOD ENDING 16 MAY 2020Data TypeReportCreated11 Aug 2020Data FormatPDFEPM 14022, NORTH MARY KATHLEEN, ANNUAL REPORT FOR PERIOD ENDING 30/7/2016
EPM 14022, NORTH MARY KATHLEEN, ANNUAL REPORT FOR PERIOD ENDING 30/7/2016Data TypeReportCreated31 Aug 2021Data FormatPDF, TXT, JPEG...Download in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.
Don’t want to wait? Request for a download link to be sent to you