-
EPM 25467 "Birthday Hills", partial relinquishment report for the period ending 19/03/2020
ActivEX Limited and Ballymore Resources Pty Ltd completed the partial relinquishment of 5 sub-blocks from EPM 25467 in March 2020. No work has been carried out within the...Data TypeReportCreated02 Sep 2020Data FormatPDFEPM19355
1 INTRODUCTION. This annual report presents the results of exploration carried out by Ausdev Land Pty Ltd within E.P.M. 19355 during the period 29 May 2017 to 28 May 2018.Data TypeReportCreated11 Nov 2020Data FormatPDF, XLSXEPM9599 EPM11886 EPM14060 EPM14209 WOOLGAR PROJECT DATA IN LIEU OF CR57752 ANNUAL ACTIVITY REPORT FOR PERIOD ENDING 20 APRIL 2009
This report details work conducted over EPMs 9599, 11886, 14060 and 14209, which make up the Woolgar Project, during the 2008 to 2009 period.Data TypeReportCreated29 Nov 2021Data FormatPDF, XLSXEPM 26286, Eureka #2, final relinquishment report for the period ending 18/12/2020
Final relinquishment report for EPM 26286, Eureka #2.Data TypeReportCreated16 Apr 2021Data FormatPDF, XLSXCentral Eastern Fold Belt, North West Queensland Solid Geology Interpretation and Insights from Crustal Architecture
An updated solid geology interpretation has been produced for a >7100 square kilometre area covering the central part of the Eastern Fold Belt (EFB) southeast of Cloncurry,...Data TypeReportCreated06 May 2021Data FormatPDF, ZIPEPM 27390, Kildare Project, final report for the period ending 10.05.2021
This report details work conducted over EPM 27390, "Kildare Project," over the life of the tenure, 8 June 2020 to 10 May 2021.Data TypeReportCreated14 Jul 2021Data FormatPDF, XLSXExploration Permit for Minerals (EPM) 17466, Victor Creek, Partial Relinquishment report for the period ending 3 August 2020
The tenement is considered prospective for Century and/or Mount Isa style sediment-hosted lead-zinc-silver mineralisation, and sediment-hosted and structurally controlled copper...Data TypeReportCreated27 Aug 2020Data FormatPDFEPM 26628, Argylla Project, partial relinquishment report for the period ending 25/08/2020
This report details the work conducted on relinquished sub blocks within EPM 26628 between the 3rd May 2018 and 25th August 2020. 4 sub-blocks have been relinquished.Data TypeReportCreated17 Feb 2021Data FormatPDF, XLSXEPM 15970, Hayfield, Annual/Final Report for period ending 22 Feb 2021
EPM 15970 “Hayfield” is part of the “Lina Glen” project, which consists of granted precious opal mine, Mining Lease (ML) 95542 “The Big Girl” of 54.06 ha and the surrounding EPM...Data TypeReportCreated14 Apr 2021Data FormatPDF, XLSXEPM25283 MT JOSS FINAL REPORT FOR PERIOD ENDING 28 OCTOBER 2021
This report details work conducted over EPM 25283, Mt Joss Project, over the life of the tenure being from 23rd September 2014 to 28th October 2021.Data TypeReportCreated06 Dec 2021Data FormatPDF, ZIP, CSVEPM26083 SHEEPSKIN CREEK FINAL REPORT FOR PERIOD ENDING 28 OCTOBER 2021
This report details work conducted over EPM 26083, Sheepskin Creek Project, over the life of the tenure, 30th June 2016 to 28th October 2021.Data TypeReportCreated06 Dec 2021Data FormatPDF, ZIP, CSVEPM27310 ROSEDALE FINAL REPORT FOR PERIOD ENDING 28 OCTOBER 2021
This report details work conducted over EPM 27310, Rosedale Project, over the life of the tenure, 15th May 2020 to 28th October 2021.Data TypeReportCreated06 Dec 2021Data FormatPDF, ZIP, CSVEPM19825 AURORA FLATS FINAL REPORT FOR PERIOD ENDING 28 OCTOBER 2021
This report details work conducted over EPM 19825, Aurora Flats Project, over the life of the tenement, 2 December 2013 to 28 October 2021.Data TypeReportCreated09 Dec 2021Data FormatPDF, ZIP, CSVEPM27113 MINGERA FINAL REPORT FOR PERIOD ENDING 22 NOVEMBER 2021
This report details work conducted over EPM 27113, Mingera Project, over the life of the tenure, 21 May 2019 to 22 November 2021.Data TypeReportCreated19 Jan 2022Data FormatPDF, XLSXEPM26003 CONNORS ARC PROJECT FINAL REPORT FOR PERIOD ENDING 29 AUGUST 2021
This report details work conducted over EPM 26003, Connors Arc Project, over the life of the tenure, 30 August 2016 to 29 August 2021.Data TypeReportCreated17 Jan 2022Data FormatPDF, ZIP, CSVEPM26647 TEMPLETON FINAL REPORT FOR PERIOD ENDING 19 NOVEMBER 2021
This report details work conducted over EPM 26647, Templeton Project, during the life of the tenure, 10 May 2018 to 19 November 2021.Data TypeReportCreated17 Jan 2022Data FormatPDF, XLSXEPM15858 SUNNY MOUNT PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 22 OCTOBER 2021
This report details work conducted over the four sub-blocks of EPM 15858, Sunny Mount Project, which were relinquished in 2021.Data TypeReportCreated22 Dec 2021Data FormatPDF, CSVEPM25756 FAIRVIEW 1 FINAL REPORT FOR PERIOD ENDING 14 OCTOBER 2021
Final report for the period ending 14 October 2021. Work undertaken included a review of previous exploration and resource information over the Fairview limestone deposits. No...Data TypeReportCreated19 Oct 2021Data FormatPDF, XLSXEPM25122 MT MACKENZIE NORTH FINAL REPORT FOR PERIOD ENDING 28 OCTOBER 2021
This report details work conducted over EPM 25122, Mt Mackenzie North Project, over the life of the tenure, 2 December 2013 to 28 October 2021.Data TypeReportCreated13 Dec 2021Data FormatPDF, ZIP, CSVEXPLORATION PERMIT FOR MINERALS (EPM) 17466, VICTOR CREEK, FINAL REPORT FOR THE PERIOD 4 AUGUST 2010 TO 3RD AUGUST 2021
EPM17466 is considered prospective for Century and/or Mount Isa style sediment-hosted lead-zinc-silver mineralisation, and sediment-hosted and structurally controlled copper...Data TypeReportCreated27 Jul 2021Data FormatPDF, XLSXDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.
Don’t want to wait? Request for a download link to be sent to you
Download started...Your download will start automatically in a few seconds.