-
EPM19487 FINAL REPORT FOR PERIOD ENDING 10 SEPTEMBER 2021
Work over the course of the tenure comprised an MMI soils program , an aqua regia soils program, and a six-line IP-resistivity survey. MIM considers the potential for economic...Data TypeReportCreated14 Oct 2021Data FormatPDF, ZIP, XLSXEPM26150 MINDIE FINAL REPORT FOR PERIOD ENDING 18 SEPTEMBER 2021
This final report outlines all the work completed by Mount Isa Mines Limited over EPM 26150 Mindie from the date of grant on 19 September 2016 to the end of the tenure on 18...Data TypeReportCreated20 Oct 2021Data FormatPDF, ZIP, XLSXExploration Permit for Minerals No 16031 Kamileroi, Queensland, Final Report
Work completed since grant of EPM 16031 Kamileroi to date of surrender included MMI soil geochemistry surveys (591 samples), one line of MT (magneto-telluric) geophysics...Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPExploration Permit for Minerals No 16786 Kamileroi 2, Queensland, Final Report
Work completed since grant of EPM 16786 Kamileroi 2 has included MMI soil geochemistry surveys (707 samples) and portions of 3 MT (magneto-telluric) geophysics survey lines.Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPEPM15570_Khartoum_North_Final&AnnualReport_2017-2019
Exploration activity within EPM15570 has indicated the two sub-blocks may be of lower prospectivity from prospectivity mapping than other areas within the Jervois Mining Limited...Data TypeReportCreated19 Mar 2021Data FormatPDF, CSVEPM19798 WHITE HILLS FINAL REPORT FOR PERIOD ENDING 20 OCTOBER 2021
this final report outlines all work completed by Mount Isa Mines Limited from grant on 21 October 2013 to end of the tenure on 20 October 2021. This work is comprised a portion...Data TypeReportCreated16 Nov 2021Data FormatPDF, ZIP, XLSXEPM25969
This report describes all mineral exploration work carried out by South32 on EPM 25969 “Sandila Bore” (the EPM) during the tenement reporting period from grant on 8th January...Data TypeReportCreated04 Sep 2020Data FormatPDF, ZIPEPM17899 Final Technical Report
EPM 17899, referred to as the Hedley project area, forms part of the greater Lawn Hill Project, managed 100% by Teck Australia Pty Ltd (Teck). The project is focused on...Data TypeReportCreated01 Sep 2020Data FormatPDFFINAL REPORT EPM 18124, TURPENTINE SOUTH
ANNUAL/FINAL REPORT EPM 18124, TURPENTINE SOUTH FROM 9 JANUARY 2016 TO 8 JANUARY 2021Data TypeReportCreated14 Oct 2020Data FormatPDFEPM16655 MARYBOROUGH BASIN FINAL REPORT FOR PERIOD ENDING 27 JANUARY 2022
EPM16655 Annual and Final Report 2021Data TypeReportCreated06 Jan 2022Data FormatPDF, TXTEPM25176 HUMPBACK FINAL REPORT FOR PERIOD ENDING 19 NOVEMBER 2021
The exploration target within EPM 25176 Humpback is a copper/gold ore body of sufficient size for trucked to Glencore infrastructure at the nearby Ernest Henry Mine. This Final...Data TypeReportCreated15 Dec 2021Data FormatPDF, ZIP, XLSXEPM 19131 ALLIGATOR CREEK FINAL REPORT FOR PERIOD ENDING 20 OCTOBER 2021
To report on exploration work carried out by MIM Resource Development Pty Limited on EPM 19131 Alligator Creek, during the year of tenure ending 20 October 2021 and to summarise...Data TypeReportCreated17 Dec 2021Data FormatPDF, XLSXEPM26125 EPM 26125 - PIGEON HOUSE FINAL REPORT FOR PERIOD ENDING 18 DECEMBER 2021
Red Metal Limited was the owner and operator of EPM 26125, Pigeon House, located 150 km northeast of Mount Isa and 140 km north of Cloncurry. The tenement covered an extensive...Data TypeReportCreated20 Dec 2021Data FormatZIP, PDF, TXTEPM25952 MAGENTA FINAL REPORT FOR PERIOD ENDING 28 FEBRUARY 2021
This report summarises work undertaken by Khalkeus Pty Ltd on EPM 25952 from the grant of tenure to the end of term when the tenement expired on 28/02/2021. This tenement was...Data TypeReportCreated21 Oct 2021Data FormatDOCX, XLSXExploration Permit for Minerals No 18757 Coolullah, Queensland, Final Report
Work completed since grant of EPM 18757 Coollullah has included MMI soil geochemistry surveys (628 samples), 7 MT (magneto-telluric) geophysics survey lines and a 430 station...Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPEPM 9453 Final report period to 29 Jan 2020
explorationData TypeReportCreated25 Mar 2021Data FormatPDFEPM 25474 FINAL REPORT
This report describes all mineral exploration work carried out by South32 on EPM 25474 “Lucknow East” (the EPM) during the reporting period 4th August 2014, when the tenement...Data TypeReportCreated17 Aug 2020Data FormatPDF, ZIPEPM17569 Final Report
This Relinquishment and Final Mineral Exploration report describes all exploration work carried out by South32 Cannington Pty Ltd for the reporting period from grant of tenement...Data TypeReportCreated17 Aug 2020Data FormatPDF, ZIPEPM26251 BOSWORTH FINAL REPORT FOR PERIOD ENDING 18 JANUARY 2022
Annual and Final Report for EPM26251 for period ending 18th of January 2022Data TypeReportCreated29 Mar 2022Data FormatPDF, XLSXEPM26180 MT APLIN FINAL REPORT FOR PERIOD ENDING 03 AUGUST 2022
EPM 26180 Mt Aplin project was obtained to explore for a range of different styles of mineralisation. Exploration has focussed on phosphate mineralisation in the along the...Data TypeReportCreated04 Oct 2022Data FormatPDF, TXTDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.
Don’t want to wait? Request for a download link to be sent to you
Download started...Your download will start automatically in a few seconds.