EPM19487 FINAL REPORT FOR PERIOD ENDING 10 SEPTEMBER 2021
Work over the course of the tenure comprised an MMI soils program , an aqua regia soils program, and a six-line IP-resistivity survey. MIM considers the potential for economic...Data TypeReportCreated14 Oct 2021Data FormatPDF, ZIP, XLSXFinal report for EPM 25993 Gipsy Project for the period 8th January 2016 to 7th January 2021
This Final report documents exploration work conducted by Newmont Exploration Pty Ltd (Newmont) on Exploration Permit for Minerals (EPM) 25993 during the reporting period 8th...Data TypeReportCreated07 Mar 2021Data FormatPDF, TXT, ZIP...EPM26150 MINDIE FINAL REPORT FOR PERIOD ENDING 18 SEPTEMBER 2021
This final report outlines all the work completed by Mount Isa Mines Limited over EPM 26150 Mindie from the date of grant on 19 September 2016 to the end of the tenure on 18...Data TypeReportCreated20 Oct 2021Data FormatPDF, ZIP, XLSXExploration Permit for Minerals No 16031 Kamileroi, Queensland, Final Report
Work completed since grant of EPM 16031 Kamileroi to date of surrender included MMI soil geochemistry surveys (591 samples), one line of MT (magneto-telluric) geophysics...Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPExploration Permit for Minerals No 16786 Kamileroi 2, Queensland, Final Report
Work completed since grant of EPM 16786 Kamileroi 2 has included MMI soil geochemistry surveys (707 samples) and portions of 3 MT (magneto-telluric) geophysics survey lines.Data TypeReportCreated29 Sep 2020Data FormatPDF, TXT, ZIPEPM15570_Khartoum_North_Final&AnnualReport_2017-2019
Exploration activity within EPM15570 has indicated the two sub-blocks may be of lower prospectivity from prospectivity mapping than other areas within the Jervois Mining Limited...Data TypeReportCreated19 Mar 2021Data FormatPDF, CSVEPM 27260 Final Report for period 20 February 2020 to 11 March 2020
Analysis of regional gravity and magnetic surveys for structural trends in the Croydon region identified EPM 27260 as an area with the potential to host a large-scale deposit of...Data TypeReportCreated03 Nov 2020Data FormatPDF, XLSXEPC 1403 Final Report for Period Ending 28 September 2020
This report summarizes the activities conducted within EPC 1403 during the term of the tenement up to relinquishment on 28 September 2020. Exploration drilling conducted during...Data TypeReportCreated20 Jan 2021Data FormatPDF, TXTFinal report for EPM 26071 (Mt Margaret project) for the period 23rd May 2016 to 6th January 2021
This report documents exploration work conducted by Newmont Exploration Pty Ltd (Newmont) on Exploration Permit for Minerals (EPM) 26071 for the period 23rd May 2016 to 6th...Data TypeReportCreated02 Mar 2021Data FormatPDF, TXT, ZIP...EPM19798 WHITE HILLS FINAL REPORT FOR PERIOD ENDING 20 OCTOBER 2021
this final report outlines all work completed by Mount Isa Mines Limited from grant on 21 October 2013 to end of the tenure on 20 October 2021. This work is comprised a portion...Data TypeReportCreated16 Nov 2021Data FormatPDF, ZIP, XLSXEPM26149 SILKYTOP FINAL REPORT FOR PERIOD ENDING 03 JULY 2021
This final report outlines all the work completed by Mount Isa Mines over EPM 26149 Silkytop from the date of grant on 4 July 2016 to the end of the tenure on 3 July 2021. EPM...Data TypeReportCreated27 Aug 2021Data FormatPDF, ZIP, XLSXEPM25969
This report describes all mineral exploration work carried out by South32 on EPM 25969 “Sandila Bore” (the EPM) during the tenement reporting period from grant on 8th January...Data TypeReportCreated04 Sep 2020Data FormatPDF, ZIPEPM17899 Final Technical Report
EPM 17899, referred to as the Hedley project area, forms part of the greater Lawn Hill Project, managed 100% by Teck Australia Pty Ltd (Teck). The project is focused on...Data TypeReportCreated01 Sep 2020Data FormatPDFFINAL REPORT EPM 18124, TURPENTINE SOUTH
ANNUAL/FINAL REPORT EPM 18124, TURPENTINE SOUTH FROM 9 JANUARY 2016 TO 8 JANUARY 2021Data TypeReportCreated14 Oct 2020Data FormatPDFMDL 3004, Katrina, Annual/Final Report for period ending 19-12-2019
The annual/final report is for the period ending 19-12-2019 when MDL 3004 was cancelled for non-payment of annual rent. The holder is of the opinion that the likely economic...Data TypeReportCreated06 Apr 2021Data FormatPDF, XLSXEPM 15970, Hayfield, Annual/Final Report for period ending 22 Feb 2021
EPM 15970 “Hayfield” is part of the “Lina Glen” project, which consists of granted precious opal mine, Mining Lease (ML) 95542 “The Big Girl” of 54.06 ha and the surrounding EPM...Data TypeReportCreated14 Apr 2021Data FormatPDF, XLSXEPM16655 MARYBOROUGH BASIN FINAL REPORT FOR PERIOD ENDING 27 JANUARY 2022
EPM16655 Annual and Final Report 2021Data TypeReportCreated06 Jan 2022Data FormatPDF, TXTEPM25176 HUMPBACK FINAL REPORT FOR PERIOD ENDING 19 NOVEMBER 2021
The exploration target within EPM 25176 Humpback is a copper/gold ore body of sufficient size for trucked to Glencore infrastructure at the nearby Ernest Henry Mine. This Final...Data TypeReportCreated15 Dec 2021Data FormatPDF, ZIP, XLSXEPM 19131 ALLIGATOR CREEK FINAL REPORT FOR PERIOD ENDING 20 OCTOBER 2021
To report on exploration work carried out by MIM Resource Development Pty Limited on EPM 19131 Alligator Creek, during the year of tenure ending 20 October 2021 and to summarise...Data TypeReportCreated17 Dec 2021Data FormatPDF, XLSXEPM26125 EPM 26125 - PIGEON HOUSE FINAL REPORT FOR PERIOD ENDING 18 DECEMBER 2021
Red Metal Limited was the owner and operator of EPM 26125, Pigeon House, located 150 km northeast of Mount Isa and 140 km north of Cloncurry. The tenement covered an extensive...Data TypeReportCreated20 Dec 2021Data FormatZIP, PDF, TXTDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.