-
EPM26123 GEORGE CREEK FINAL REPORT FOR PERIOD ENDING 30 JULY 2021
EPM26123 GEORGE CREEK FINAL REPORT FOR PERIOD ENDING 30 JULY 2021Data TypeReportCreated12 Oct 2021Data FormatPDF, XLSXEPM19209 ULAN RANGE FINAL REPORT FOR PERIOD ENDING 06 AUGUST 2020
EPM 19209 known as the Ulan Range Project, is held by Tasmania Mines Pty Ltd. The tenure is located approximately 40km west of the port of Gladstone and 50km southeast of...Data TypeReportCreated20 Sep 2021Data FormatPDF, XLSXEPM25877 CENTRAL CAPE YORK FINAL REPORT FOR PERIOD ENDING 31 OCTOBER 2021
The tenement area encompassed several laterite plateaus that were considered to have the potential to host bauxite. Widespread reconnaissance-style bauxite and kaolin...Data TypeReportCreated01 Nov 2021Data FormatPDF, XLSXEPM18457 BRANWELL FINAL REPORT FOR PERIOD ENDING 29 MAY 2021
The tenement was acquired by Gulf Alumina Ltd to explore for bauxite within laterite plateaus developed on Rolling Downs Group and Bulimba Formation sediments.Data TypeReportCreated06 Oct 2021Data FormatPDF, XLSXEPM 18457, BRANWELL, ANNUAL REPORT FOR PERIOD ENDING 29/5/2021
EPM 18457, consisting of 34 sub-blocks in three separate areas, is centred approximately 80 km northeast of Weipa on Cape York Peninsula. The tenement was acquired by Gulf...Data TypeReportCreated05 Oct 2021Data FormatPDFEPM15985 PENNEFATHER FINAL REPORT FOR PERIOD ENDING 23 JULY 2021
The tenement formed part of Metro Minings Cape York bauxite project which covers known bauxite deposits and prospective plateau areas outside the Rio Tinto Alcan mining leases...Data TypeReportCreated05 Oct 2021Data FormatPDF, XLSXEPM16753 JACKSON RIVER FINAL REPORT FOR PERIOD ENDING 24 OCTOBER 2021
EPM 16753 was surrendered on 2nd September 2021. The tenement was centered approximately 130 km north of Weipa on Cape York Peninsula. It was granted to Gulf Alumina Ltd in...Data TypeReportCreated16 Nov 2021Data FormatPDF, XLSXEPM14633 MERAPAH WEST. FINAL REPORT FOR PERIOD ENDING 02 SEPTEMBER 2021
EPM 14633 was surrendered on 2nd September 2021. The tenement, of an initial 100 sub-blocks, was located approximately 150 km south southeast of Weipa. It was granted on 9th...Data TypeReportCreated03 Nov 2021Data FormatPDF, XLSXEPM 27390, Kildare Project, final report for the period ending 10.05.2021
This report details work conducted over EPM 27390, "Kildare Project," over the life of the tenure, 8 June 2020 to 10 May 2021.Data TypeReportCreated14 Jul 2021Data FormatPDF, XLSXEPM 15372, JARDINE, ANNUAL/FINAL TECHNICAL REPORT FOR PERIOD ENDING 28/9/2020
The Oresome Cape York Heavy Mineral Sands and Bauxite Project comprises of twelve granted tenements. All of the tenements are situated on western and northern Cape York and...Data TypeReportCreated25 Mar 2021Data FormatPDFEPM14547 PISOLITE HILLS FINAL REPORT FOR PERIOD ENDING 24 SEPTEMBER 2021
Exploration Permit for Minerals 14547 was granted to Cape Alumina Pty Ltd on the 20th April 2006 to explore for bauxite. It was surrendered on 24th September 2021. The tenement...Data TypeReportCreated09 Dec 2021Data FormatPDF, XLSXEPM25879 SOUTHERN CAPE YORK PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 11 DECEMBER 2021
EPM 25879 was granted on 13th July 2016 following the conditional surrender of EPMs 15077, 15263 and 15269. The tenement is held by Cape Alumina Pty Ltd, a wholly owned...Data TypeReportCreated20 Dec 2021Data FormatPDF, XLSXEPM25878 NORTHERN CAPE YORK PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 29 NOVEMBER 2021
EPM 25878 was granted on 13th July 2016 following the conditional surrender of EPMs 15374 and 15375. The tenement is held by Cape Alumina Pty Ltd, a wholly owned subsidiary of...Data TypeReportCreated20 Dec 2021Data FormatPDF, XLSXEPM 25687, VRILYA EAST, FINAL TECHNICAL REPORT FOR PERIOD ENDING 1/4/2019
The Oresome Cape York Heavy Mineral Sands and Bauxite Project comprises of ten granted tenements. All of the tenements are situated on western and northern Cape York and cover...Data TypeReportCreated25 Mar 2021Data FormatPDFDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.
Don’t want to wait? Request for a download link to be sent to you
Download started...Your download will start automatically in a few seconds.