EPM 26775, Pilgrim North Project, partial relinquishment report for the period ending 25/08/2020
This report details the work conducted on relinquished sub blocks within EPM 26775 between the 16th November 2018 and 25th August 2020. 7 sub-blocks have been relinquished.Data TypeReportCreated17 Feb 2021Data FormatPDF, XLSXEPM16327 BAN BAN FINAL REPORT FOR PERIOD ENDING 06 APRIL 2021
Work included detailed review of geology, tectonics, geochemistry and mineral potential of the Esk Trough as part of a State Government funded Industry Network Initiative. This...Data TypeReportCreated08 Oct 2021Data FormatPDF, XLSXEPM 19203 Mt Fairyland Relinquishment Report for Sub-Blocks Relinquished 03 March 2019
This report provides details of exploration undertaken with sub-blocks relinquished from EPM19203 effective from 03 March 2019.There has been no exploration mapping or...Data TypeReportCreated31 May 2021Data FormatPDF, XLSXEPM 16201 - Kuridala North Annual and Final Report for the period 27 January 2010 ending 26 January 2021
Exploration Permit for Minerals EPM 16201, Kuridala North, was obtained to explore for iron oxide-coppergold mineralisation, copper-gold mineralisation, massive sulphide...Data TypeReportCreated26 Mar 2021Data FormatPDF, XLSXEPM 17832, Ravenswood Project, final report for the period ending 17/06/2021
This report details work conducted over EPM 17832, "Ravenswood Project," over the life of the tenure, 31 May 2011 to 17 June 2021.Data TypeReportCreated08 Jul 2021Data FormatPDF, XLSXEPM 14038, Robey Range Project, final report for the period ending 17/06/2021
This report details work conducted over EPM 14038, "Robey Range Project," over the life of the tenure, 10 June 2004 to 17 June 2021.Data TypeReportCreated08 Jul 2021Data FormatPDF, XLSXFourteenth and Final Activity Report for the reporting period ending 19 June 2021 for EPM15771 Gladstone Manganese Project
Genesis Resources Ltd, have held the Gladstone EPM 15771, since June 2007. It was acquired at a time when it was thought that manganese demand in China would increase. .A number...Data TypeReportCreated22 Jun 2021Data FormatPDF, XLSXEPM 26628, Argylla Project, partial relinquishment report for the period ending 25/08/2020
This report details the work conducted on relinquished sub blocks within EPM 26628 between the 3rd May 2018 and 25th August 2020. 4 sub-blocks have been relinquished.Data TypeReportCreated17 Feb 2021Data FormatPDF, XLSXEPM26251 BOSWORTH FINAL REPORT FOR PERIOD ENDING 18 JANUARY 2022
Annual and Final Report for EPM26251 for period ending 18th of January 2022Data TypeReportCreated29 Mar 2022Data FormatPDF, XLSXEPM14979 FINAL REPORT FOR PERIOD ENDING 01 APRIL 2021
EPM14979 FINAL REPORT FOR PERIOD ENDING 01 APRIL 2021Data TypeReportCreated27 Apr 2022Data FormatPDF, XLSXEPM25537 CANNINDAH SOUTH PROJECT FINAL REPORT FOR PERIOD ENDING 16 JANUARY 2019
This report details work conducted over EPM 25537, Cannindah South Project, over the life of the tenure, 11 November 2014 to 17 January 2019.Data TypeReportCreated14 Sep 2022Data FormatPDF, XLSXCOLLABORATIVE EXPLORATION INITIATIVE ROUND 5 - CEI0322 SURFACE GEOCHEMICAL SURVEY, MOUNT COBALT CORRIDOR, NW, QLD - CEI EXPLORATION - EPM26715 EPM26746 EPM26770 EPM26690 FINAL REPORT
Cobalt Corridor Geochemical Innovation Study - 39km2 Stream Sediment Survey / 41km2 Soil/Lag surveyData TypeReportCreated15 Dec 2022Data FormatPDF, XLSX, ZIPMINERAL GEOCHEMISTRY VECTORING
The Mineral Geochemistry Vectoring project was undertaken by researchers at the Centre for Ore Deposit and Earth Sciences (CODES) as part of the Queensland Government's...Data TypeReportCreated23 Sep 2021Data FormatPDF, ZIP, XLSXEPM8452 MAUREEN FINAL REPORT FOR PERIOD ENDING 04 JANUARY 2022
Final report for EPM 8452, Maureen, for period ending 4 January 2022. Following drilling programs by Mega Georgetown in 2006 and 2007, Mining Associates was commissioned to...Data TypeReportCreated13 Apr 2022Data FormatPDF, XLSXEPM27035 SERPENTINITE RIDGE, MARLBOROUGH FINAL REPORT FOR PERIOD ENDING 10 JANUARY 2023
No Mineral Resources and Ore Reserve Statements exist for this project due to the early stage of exploration with no drilling having taken place.Data TypeReportCreated30 Mar 2023Data FormatPDF, XLSXDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.
Don’t want to wait? Request for a download link to be sent to you