EPM26123 GEORGE CREEK FINAL REPORT FOR PERIOD ENDING 30 JULY 2021
EPM26123 GEORGE CREEK FINAL REPORT FOR PERIOD ENDING 30 JULY 2021Data TypeReportCreated12 Oct 2021Data FormatPDF, XLSXEPM25877 CENTRAL CAPE YORK FINAL REPORT FOR PERIOD ENDING 31 OCTOBER 2021
The tenement area encompassed several laterite plateaus that were considered to have the potential to host bauxite. Widespread reconnaissance-style bauxite and kaolin...Data TypeReportCreated01 Nov 2021Data FormatPDF, XLSXEPM18457 BRANWELL FINAL REPORT FOR PERIOD ENDING 29 MAY 2021
The tenement was acquired by Gulf Alumina Ltd to explore for bauxite within laterite plateaus developed on Rolling Downs Group and Bulimba Formation sediments.Data TypeReportCreated06 Oct 2021Data FormatPDF, XLSXEPM25146 Final Report
On 7 January 2014, EPM 25146 “Toondoon” was granted to ABx3 Pty Ltd (“ABx3”), a fully owned subsidiary of Australian Bauxite Limited (“ABx”), initially for a period of three...Data TypeReportCreated29 Mar 2021Data FormatDOCX, XLSXEPM 18132, CHILDERS BAUXITE, FINAL REPORT FOR PERIOD 19/2/2012 TO 18/2/2013
EPM 18132, CHILDERS BAUXITE, FINAL REPORT FOR PERIOD 19/2/2012 TO 18/2/2013Data TypeReportCreated01 Mar 2021Data FormatZIP, PDF, JSON...Fourteenth and Final Activity Report for the reporting period ending 19 June 2021 for EPM15771 Gladstone Manganese Project
Genesis Resources Ltd, have held the Gladstone EPM 15771, since June 2007. It was acquired at a time when it was thought that manganese demand in China would increase. .A number...Data TypeReportCreated22 Jun 2021Data FormatPDF, XLSXEPM15985 PENNEFATHER FINAL REPORT FOR PERIOD ENDING 23 JULY 2021
The tenement formed part of Metro Minings Cape York bauxite project which covers known bauxite deposits and prospective plateau areas outside the Rio Tinto Alcan mining leases...Data TypeReportCreated05 Oct 2021Data FormatPDF, XLSXEPM16753 JACKSON RIVER FINAL REPORT FOR PERIOD ENDING 24 OCTOBER 2021
EPM 16753 was surrendered on 2nd September 2021. The tenement was centered approximately 130 km north of Weipa on Cape York Peninsula. It was granted to Gulf Alumina Ltd in...Data TypeReportCreated16 Nov 2021Data FormatPDF, XLSXEPM14633 MERAPAH WEST. FINAL REPORT FOR PERIOD ENDING 02 SEPTEMBER 2021
EPM 14633 was surrendered on 2nd September 2021. The tenement, of an initial 100 sub-blocks, was located approximately 150 km south southeast of Weipa. It was granted on 9th...Data TypeReportCreated03 Nov 2021Data FormatPDF, XLSXEPM14547 PISOLITE HILLS FINAL REPORT FOR PERIOD ENDING 24 SEPTEMBER 2021
Exploration Permit for Minerals 14547 was granted to Cape Alumina Pty Ltd on the 20th April 2006 to explore for bauxite. It was surrendered on 24th September 2021. The tenement...Data TypeReportCreated09 Dec 2021Data FormatPDF, XLSXEPM25879 SOUTHERN CAPE YORK PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 11 DECEMBER 2021
EPM 25879 was granted on 13th July 2016 following the conditional surrender of EPMs 15077, 15263 and 15269. The tenement is held by Cape Alumina Pty Ltd, a wholly owned...Data TypeReportCreated20 Dec 2021Data FormatPDF, XLSXEPM25878 NORTHERN CAPE YORK PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 29 NOVEMBER 2021
EPM 25878 was granted on 13th July 2016 following the conditional surrender of EPMs 15374 and 15375. The tenement is held by Cape Alumina Pty Ltd, a wholly owned subsidiary of...Data TypeReportCreated20 Dec 2021Data FormatPDF, XLSXGSQ TECHNICAL NOTES - TN2022/03, GALLIUM IN QUEENSLAND BAUXITE DEPOSITS
This data package contains multi-element geochemistry of bauxitic laterite deposits in Queensland, Australia. The focus of this package was on bauxites of Cape York, but samples...Data TypeReportCreated06 Dec 2022Data FormatPDF, XLSX, ZIPEPM27035 SERPENTINITE RIDGE, MARLBOROUGH FINAL REPORT FOR PERIOD ENDING 10 JANUARY 2023
No Mineral Resources and Ore Reserve Statements exist for this project due to the early stage of exploration with no drilling having taken place.Data TypeReportCreated30 Mar 2023Data FormatPDF, XLSXDownload in queue. Do not close this page.Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.